Oil Drilling


Recent Rotary Rig Count May 17th, 2013



AREA

 LAST
COUNT
DATE

COUNT 

CHANGE FROM
PRIOR COUNT
 

DATE OF
PRIOR COUNT 

 CHANGE FROM 
LAST YEAR

DATE
OF LAST
 YEARS COUNT 

UNITED STATES 

5/17/13 

1769
+0
5/10/13

-217

5/18/12

CANADA 

5/17/13
118
+5

5/10/13

0

5/18/12 

USA OFFSHORE 

5/17/13 

 52
+2
5/10/13

 +5

5/18/12 

INTERNATIONAL 

04/2013 

1301

 +33

3/2013 

 +123

4/2012 



Drilling Ahead

World Oilfield Forum

July 2010 Blog Posts (5)

Black Gold-Season 3-Watch All Episodes of Black Gold Here



Black Gold Logo

Watch These Exciting Episodes Of Black Gold Here…

Continue

Added by Drilling Ahead on July 26, 2010 at 9:00pm — 119 Comments

Post Shut-In Procedures While Tripping -What data should be recorded?

After you complete shut in procedure while tripping, there is following information that must be recorded before making any decision on how to kill the well.

 



Shut-In Casing Pressure (SICP): Read and record…
Continue

Added by Rachain Jetjongjit on July 21, 2010 at 1:30am — No Comments

Shut-In Procedure while Tripping



Tripping out of the hole is a critical operation, which drilling team must keep close eye on well control situation that can

occur anytime. Wellbore monitoring and hole filling equipment and must be working properly so that the kick can be quickly detected. You must be aware of and prepared for the well…
Continue

Added by Rachain Jetjongjit on July 17, 2010 at 7:30pm — No Comments

Post Shut-In Procedures while Drilling

There are several figures that must be recorded after the well has been properly shut in in case of a well control situation.

 



Shut-In Casing Pressure (SICP): Read and record the shut-in casing pressure (casing gauge).




In order to get the proper pressure reading, the casing gauge should be… Continue

Added by Rachain Jetjongjit on July 11, 2010 at 9:30pm — No Comments

Shut-In Procedure while Drilling

While drilling, drilling team must be carefully check for well control indicators and if the positive kick indicator(s) indicated, crew must instantly know how to shut in the well in correct manner. The steps below, called "3S" shut-in procedures, demonstrate how to properly shut the well in while drilling.



Drilling shut in procedures (3S) – HARD SHUT IN… Continue

Added by Rachain Jetjongjit on July 2, 2010 at 11:30am — No Comments

Blog Topics by Tags

Monthly Archives

2013

2012

2011

2010

2009

Sign Up To Receive Special Offers
Sign Up Here
 

Executive Oil Gifts

Drill Pipe Tongs Keychain

Offshore Oil Platform Model Music Box
Pump Jack Working Model Music Box

Drill Pipe Elevator Pendant

Tricone Drill Bit Jewelry

Drill Pipe Tally Books

© 2013   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service