Drilling Ahead

World Oilfield Forum

All Blog Posts Tagged 'Directional' (1)

Directional Drilling Calculations

I got the question from my friend, Nien, asking me about directional drilling calculation and the question is shown below:



Wellplanner is planning to design a deep kick-off well with a build section to by pass a salt dome section. He intends to achieve a horizontal departure of 1500 ft at the with the TVD at the target point to be 10,000 ft. Calculate the measure depth and build up rate.

 …

Continue

Added by Rachain Jetjongjit on January 11, 2011 at 9:00pm — 4 Comments

Most Popular Blog Posts

Monthly Archives

2014

2013

2012

2011

2010

2009

Sign Up To Receive Special Offers
Sign Up Here
 

Oilfield Gifts

Oilfield Drill Pipe Tally Books

 

Oilfield Jewelry Drill Pipe Elevators

 

Oil and gas Gift Pump Jack Music Box

 

 

Oilfield Keychains

 

© 2014   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service