Drilling Ahead

World Oilfield Forum

Drilling Ahead's Blog Posts Tagged 'Procedure' (1)

New Drill Pipe Make Up Procedure

Proper initial make-up is probably the most important factor affecting the life of the tool joint connections.



Here are some recommendations to follow:




1. Proper make-up torque is determined by the connection type, size, OD and ID and may be found in…

Continue

Added by Drilling Ahead on April 11, 2011 at 11:30am — 6 Comments

Most Popular Blog Posts

Monthly Archives

2014

2013

2012

2011

2010

2009

Sign Up To Receive Special Offers
Sign Up Here
 

Oilfield Gifts

Oilfield Drill Pipe Tally Books

 

Oilfield Jewelry Drill Pipe Elevators

 

Oil and gas Gift Pump Jack Music Box

 

 

Oilfield Keychains

 

© 2014   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service