Oil Drilling


Recent Rotary Rig Count June 14th, 2013



AREA

 LAST
COUNT
DATE

COUNT 

CHANGE FROM
PRIOR COUNT
 

DATE OF
PRIOR COUNT 

 CHANGE FROM 
LAST YEAR

DATE
OF LAST
 YEARS COUNT 

UNITED STATES 

6/14/13 

1771

+6

6/7/13

-200

6/15/12

CANADA 

6/14/13

176

+24

6/7/13

-72

6/15/12 

USA OFFSHORE 

6/14/13 

 54

-2

6/7/13

 +3

6/15/12 

INTERNATIONAL 

05/2013 

1283

 -18

4/2013 

 +58

5/2012 

Drilling Ahead

World Oilfield Forum

All Blog Posts Tagged 'control' (2)

Well Control Formulas

These are some well control formulas that I have learned from my well control school and I would like to share with you guys. Please feel free to comments or give me suggestions.



Pressure (P) - psi



Pressure (psi) = Force (lb) / Area in Square Inch (in 2)…



Continue

Added by Rachain Jetjongjit on October 18, 2010 at 12:30am — 7 Comments

Lag Time and Its Importance for Well Control Operation

Drilling personnel need to fully understand about the lag time. Lag time is time delay from pressure adjustment made on a choke valve or a choke HCR to show up on the drill pipe pressure gauge.

Does it sound confuse? Let’s me explain more about it. When you adjust a choke position, you will not be able to see changes on the drill pipe gauge right away because drilling fluid is compressible so you need to be patient and wait a little bit until you see the… Continue

Added by Rachain Jetjongjit on August 5, 2010 at 9:30pm — No Comments

Sign Up To Receive Special Offers
Sign Up Here
 

Executive Oil Gifts

Drill Pipe Tongs Keychain

Offshore Oil Platform Model Music Box
Pump Jack Working Model Music Box

Drill Pipe Elevator Pendant

Tricone Drill Bit Jewelry

Drill Pipe Tally Books

© 2013   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service