Oil Drilling


Recent Rotary Rig Count May 17th, 2013



AREA

 LAST
COUNT
DATE

COUNT 

CHANGE FROM
PRIOR COUNT
 

DATE OF
PRIOR COUNT 

 CHANGE FROM 
LAST YEAR

DATE
OF LAST
 YEARS COUNT 

UNITED STATES 

5/17/13 

1769
+0
5/10/13

-217

5/18/12

CANADA 

5/17/13
118
+5

5/10/13

0

5/18/12 

USA OFFSHORE 

5/17/13 

 52
+2
5/10/13

 +5

5/18/12 

INTERNATIONAL 

04/2013 

1301

 +33

3/2013 

 +123

4/2012 



Drilling Ahead

World Oilfield Forum

Lag Time and Its Importance for Well Control Operation

Drilling personnel need to fully understand about the lag time. Lag time is time delay from pressure adjustment made on a choke valve or a choke HCR to show up on the drill pipe pressure gauge.

Does it sound confuse? Let’s me explain more about it. When you adjust a choke position, you will not be able to see changes on the drill pipe gauge right away because drilling fluid is compressible so you need to be patient and wait a little bit until you see the changes on the drill pipe gauge.


How can we know how many seconds for the lag time?

We can roughly estimate the lag time about 2 seconds per 1,000 MD. This number is just a rule of thumb. If you want the actual lag time, you can determine it by performing a choke drill. You really need to know about the lag time otherwise you can get confused a lot when you attempt to adjust drill pipe pressure.

Ref: Lag time well control

Views: 215

Tags: control, lag, time, well

Comment

You need to be a member of Drilling Ahead to add comments!

Join Drilling Ahead

Sign Up To Receive Special Offers
Sign Up Here
 

Executive Oil Gifts

Drill Pipe Tongs Keychain

Offshore Oil Platform Model Music Box
Pump Jack Working Model Music Box

Drill Pipe Elevator Pendant

Tricone Drill Bit Jewelry

Drill Pipe Tally Books

© 2013   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service