Oil Drilling


Recent Rotary Rig Count May 10th, 2013



AREA

 LAST
COUNT
DATE

COUNT 

CHANGE FROM
PRIOR COUNT
 

DATE OF
PRIOR COUNT 

 CHANGE FROM
LAST YEAR

DATE
OF LAST
 YEARS COUNT 

UNITED STATES 

5/10/13 

1769

+5

5/3/13

-205

5/11/12

CANADA 

5/10/13

118

-3

5/3/13

-2

5/11/12 

USA OFFSHORE

5/10/13 

 50

-1

5/3/13

 +5

5/11/12 

INTERNATIONAL

04/2013 

1301

 +33

3/2013 

 +123

4/2012 

Drilling Ahead

World Oilfield Forum

The tangential method is the simplest calculation among other directional survey calculations.

Tangential Method Calculation

The tangential method formulas are listed below;

TTangential Method Calculation formula

Where;

MD = Measured Depth between surveys in ft

I1 = Inclination (angle) of upper survey in degrees

I2 = Inclination (angle) of lower in degrees

Az1= Azimuth direction of upper survey

Az2 = Azimuth direction of lower survey

The following example is the Tangential Method Calculation.

Survey 1

Depth = 3500 ft

Inclination = 15 degree (I1)

Azimuth = 20 degree (Az1)

Survey 2

Depth = 3600 ft

Inclination = 25 degree (I2)

Azimuth = 45 degree (Az2)

Solution:

MD = 3600 – 3500 = 100 ft

Tangential Method Calculation

As per the formulas above, you will get answers as listed below;

North = 29.88 ft

East = 29.88 ft

TVD = 90.63 ft

Please find the Excel sheet used for The Tangential Method Calculation

Ref: Tangential Method Calculation

Views: 762

Comment

You need to be a member of Drilling Ahead to add comments!

Join Drilling Ahead

Sign Up To Receive Special Offers
Sign Up Here
 

Executive Oil Gifts

Drill Pipe Tongs Keychain

Offshore Oil Platform Model Music Box
Pump Jack Working Model Music Box

Drill Pipe Elevator Pendant

Tricone Drill Bit Jewelry

Drill Pipe Tally Books

© 2013   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service