Drilling Ahead

World Oilfield Forum

well finally cemented surface after 2 days of pumping on it and no return. we were waiting on cement the hole time

Comment

You need to be a member of Drilling Ahead to add comments!

Join Drilling Ahead

Comment by Brian Marquez on September 17, 2011 at 5:22pm
. pumped it and still no cement back so u guessing right one inch it now . lost circ at 110 ft..lol and did i mention we lost are cellar what a hole we have now
Sign Up To Receive Special Offers
Sign Up Here
 

Oilfield Gifts

Oilfield Drill Pipe Tally Books

 

Oilfield Jewelry Drill Pipe Elevators

 

Oil and gas Gift Pump Jack Music Box

 

 

Oilfield Keychains

 

© 2014   Created by Drilling Ahead.

Badges  |  Report an Issue  |  Terms of Service